Verify the conflicting heat reference with the supplier.
| Record reference | REC-1005 |
| PO number | PO-77435 |
| Receipt number | RCP-900005 |
| Supplier | SUP-NORTHBAY |
| Received heat | Heat-4890-W |
| Received lot | LOT-4890-01 |
| Material | S355J2+N ยท Plate 20mm |
| Certificate type required | 3.1 |
The line this record was read from, in received_lots.csv.
Open the whole export →
| Run | 3fe7e4f13e02cf7c |
| Rule | anchored_certificate_conflicts |
| Exception class | certificate_heat_does_not_match_received_lot |
| Export column read | heat_number |
| Reason recorded by the run | MTC-NB-4899-V-3.1.pdf is anchored to this record, but its heat 'Heat-4899-V' differs from the received heat 'Heat-4890-W'. |
MTC-NB-4899-V-3.1.pdf is anchored to this record, but its heat 'Heat-4899-V' differs from the received heat 'Heat-4890-W'.
| Certificate | Anchored by | Checks | ||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MTC-NB-4899-V-3.1.pdf | Order reference |
|
MTC-NB-4899-V-3.1.pdf - page 1 - heat_number = Heat-4899-V [heat_identity: CONFLICT, adapter extract_northbay_steel] MTC-NB-4899-V-3.1.pdf - page 1 - lot_number = LOT-4899-01 [lot_identity: CONFLICT, adapter extract_northbay_steel] MTC-NB-4899-V-3.1.pdf - page 1 - po_number = PO-77435 [transaction_reference: MATCH, adapter extract_northbay_steel] MTC-NB-4899-V-3.1.pdf - page 1 - certificate_number = MTC-NB-4899-V-3.1 [certificate_reference: MATCH, adapter extract_northbay_steel] MTC-NB-4899-V-3.1.pdf - page 1 - certificate_type = 3.1 [certificate_type: MATCH, adapter extract_northbay_steel] MTC-NB-4899-V-3.1.pdf - page 1 - supplier = Northbay Steel Oy [supplier_identity: MATCH, adapter extract_northbay_steel]